Removal
JCB Electronic Service Tool Diagnostic Kit High Quality
Park the machine on firm level ground, engage the
parking brake and set the transmission to neutral.
Lower the loader arms to the ground.
2
Position the carriage in the central protruding travel
position at 150 mm (6 in) from end of the rail, rest the
bucket on the ground and remove the starter key.
JCB ServiceMaster/WinEEM4 KG v2 Keygen
3
Operate control levers to vent hydraulic pressure.
4
Disconnect hydraulic hoses A and plug.
5
Disconnect all four chains at adjusters B and disengage
chains from ram pulleys.
6
Remove pin C from one end and support the ram.
7
Remove pin C from opposite end, withdraw ram.
Replacement
1
Locate the ram at one end with pin C. Adjust the ram
eye end so the the opposite end of the ram aligns with
mounting bracket.
2
Secure the opposite end of the ram in position with pin
- C.
3
With a spanner on the rod end flats D adjust the rod so
that the ram eye end engagement is equal at each end
of the ram. Lock eye ends in position with nut E.
4
Reconnect the hydraulic hoses.
5
Locate the chains around the applicable ram pulleys.
Reconnect chains and adjust as required, refer to
Service Procedures, Power Sideshift – Chain
Adjustment.
Park the machine on firm level ground, engage the
parking brake and set the transmission to neutral.
Lower the loader arms to the ground.
2
Position the carriage in the central protruding travel
position at 150 mm (6 in) from end of the rail, rest the
bucket on the ground and remove the starter key.
3
Operate control levers to vent hydraulic pressure.
4
Disconnect hydraulic hoses A and plug.
5
Disconnect all four chains at adjusters B and disengage
chains from ram pulleys.
6
Remove pin C from one end and support the ram.
7
Remove pin C from opposite end, withdraw ram.
Replacement
1
Locate the ram at one end with pin C. Adjust the ram
eye end so the the opposite end of the ram aligns with
mounting bracket.
2
Secure the opposite end of the ram in position with pin
- C.
3
With a spanner on the rod end flats D adjust the rod so
that the ram eye end engagement is equal at each end
of the ram. Lock eye ends in position with nut E.
4
Reconnect the hydraulic hoses.
07.2026 JCB ServiceMaster 4 v26.7.1 Diagnostic Software with SW Files Download and installation
5
Locate the chains around the applicable ram pulleys.
Reconnect chains and adjust as required, refer to
Service Procedures, Power Sideshift – Chain
Adjustment.
Park the machine on firm level ground, engage the
parking brake and set the transmission to neutral.
Lower the loader arms to the ground.
2
Position the carriage in the central protruding travel
position at 150 mm (6 in) from end of the rail, rest the
bucket on the ground and remove the starter key.
3
Operate control levers to vent hydraulic pressure.
4
Disconnect hydraulic hoses A and plug.
5
Disconnect all four chains at adjusters B and disengage
chains from ram pulleys.
6
Remove pin C from one end and support the ram.
7
Remove pin C from opposite end, withdraw ram.
Replacement
1
Locate the ram at one end with pin C. Adjust the ram
eye end so the the opposite end of the ram aligns with
mounting bracket.
2
Secure the opposite end of the ram in position with pin
- C.
3
With a spanner on the rod end flats D adjust the rod so
that the ram eye end engagement is equal at each end
of the ram. Lock eye ends in position with nut E.
4
Reconnect the hydraulic hoses.
5
Locate the chains around the applicable ram pulleys.
Reconnect chains and adjust as required, refer to
Service Procedures, Power Sideshift – Chain
Adjustment.
