4JH1 Engine of ISUZU Installation



This article describes the installation of the Isuzu engine

ISUZU IDSS MX2-T Diagnostic Adapter System Support G-IDSS/US-IDSS/E-IDSS(Included DHL Shipping )

 

1.Installthe engine assembly to the vehicle.

  • Positionenginemountings by using hoist.

2.Install the support rubber.

  • After    all    fixing    bolts(left:twobolts,right:twobolts)

were   inserted   to   every    holes,and   engine assembly   and   tighten   fixing   bolts   to   the specified torque

Tightening torque:    48 Nm(4.9 kg m/351b·ft)

3.Install   the   power   steering    pump   and   bracketassembly.

  • P/Spumplock  bolt  loose,adjust  belt  tension with adjust belt.

Tightening torque

Idler lock nut:             27 Nm(2.8 kg·m/20 Ib·ft)

4.Install  the  radiator.

Refer to “Radiator”in Section 6B Engine Cooling.

5.Connect the vacuum hose from the vacuum pump.

6.Connect the ECM connector and clip.

7.Connect the fuel  hose.

  • Connectthefuel inlet hose and fuel return hose to fuel supply pump.

8.Install the air intake pipe and hoses.

  • Installthe  pipe  and  hoses  between  the  intakethrottle valve and intercooler.
  • Useanew   hose   clamp,align   it   with    the marking,and tighten it at the specified torque.

Tightening torque

Clamp:                        8.0Nm(0.8  kg-m/71  Ib-in)

  • Fixtheair intake pipe to the bracket.

Tightening torque:    20  Nm(2.0  kg·m/177.5Ib-in)

9.Connect    the    boost    sensor    connector.(Euro4 specification)

1.Boost  sensor  connector

10.Install the air intake pipe and hoses.

  • Installthe    pipe    and    hoses    between    theturbocharger and intercooler.
  • Useanew   hose   clamp,align   it   with    the marking,and tighten it at the specified torque.

Tightening torque

Clamp:                        8.0 N·m(0.8 kg m/71 Ib-in)

  • Fixtheair intake pipe to the bracket.

Tightening torque:    20 N·m(2.0 kg-m/177.5 Ibin)

09.2024 ISUZU E-IDSS Diagnostic Software Download and Installation Service

12.Connect the  heater  hose.

 02.2025 ISUZU US-IDSS II Truck Diagnostic System Download and Installation

13.Install  the  transmission.

Refer to “Manual Transmission”in Section 7B.

14.Install the front exhaust pipe and exhaust brake.     Refer  to   “Exhaust  Pipe”and  “Exhaust  Brake”in Section 6F,Engine Exhaust.

15.Connect the engine ground cable from the frame.

16.Connect the B terminal from the starter motor

17.Installthe  cab.(Non-tlt  cab  model  only) Refer to “FRAME AND CAB”Section 2.

18.Refill the engine coolant.

19.Connect the battery cable negative terminal.